Case Study

Upgrade Electrical infrastructure, Majaz Tower

Due to multi electrical problems in earthing, nutrals...at Majaz Tower which caused a lot of light burs, short circuits, breaker trips, Rakaz EM gave a study of possible solutions for such problems which has been applied later on.  ...

Upgrade Electrical infrastructure, Bahbahani Tower

Due to multi electrical problems in earthing, nutrals...at Bahbahani Tower which caused a lot of light burs, short circuits, breaker trips, elevator stop working. Rakaz EM gave a study of possible solutions for such problems which has been applied later on successfully    ...

Decrease the power consumption at Al Borj Tower

Due to high power consumption in this tower, a new concept has to be provided to reduce it at least by 25%. a study has been provided by Rakazem to the Borj Tower OA which it did meet the target....